Featured study
Single-level residential
Alexander Construction
Napier, Hawkes Bay, New Zealand
A time and motion study of Alexander Construction's first Truss House build. 31 frames installed across 125 sqm in 136 minutes of active framing time — on a first build, with no optimisations applied.
- Active framing time
- 136 min (31 frames)
- Total elapsed time
- 305 min (5 hrs 5 min)